We provide supervision of the construction of wind farms and single wind turbines. Our team consists of highly qualified employees who possess all the necessary building authorizations. This enables us to act as building site manager and supervise construction as regards the building, road and energy fields. If it is necessary we also represent the investor or the general contractor on the building site, we carry out inspections of work in progress as regards its conformity to the project, the conditions of the building permit, the latest technical knowledge and the signed contract.

So far we have been the building site manager or supervisor of construction on single wind turbine or wind farm projects with a total capacity of 70 MW. Our activities include the construction of wind turbines along with the whole accompanying infrastructure i.e. access roads together with manoeuvring areas, exits to public roads, medium voltage cable lines and optical fibres.


Wind farm projects:

  • ORNETA 1 ? comprising 10 Vestas V-90 wind turbines, each with a capacity of 2 MW, located in the Łódź and Greater Poland voivodeships,
  • MOG 8 - comprising 10 Vestas V-90 wind turbines, each with a capacity of 2 MW, located in the Łódź and Masovian voivodeships,
  • SIERADZ - comprising 5 Vestas V-90 wind turbines, each with a capacity of 2 MW, located in the Łódź voivodeship,
  • CHARŁUPIA WIELKA - comprising 4 Vestas V-90 wind turbines, each with a capacity of 2 MW, located in the Łódź voivodeship.

Single wind turbines:

  • Pruszków ? 1 Enercon E-53 wind turbine with a capacity of 0,8 MW, located in the Łódź voivodeship,
  • Kaszewy Dworne - 1 Enercon E-53 wind turbine with a capacity of 0,8 MW, located in the Łódź voivodeship,
  • Plecka Dąbrowa - 1 Enercon E-53 wind turbine with a capacity of 0,8 MW, located in the Łódź voivodeship,
  • Kiki - 1 Enercon E-53 wind turbine with a capacity of 0,8 MW, located in the Łódź voivodeship
  • Wola Raciborowska ? 2 Power Wind 56 wind turbines, each with a capacity of 0,9 MW, located in the Łódź voivodeship,
  • Podule - 1 Enercon E-66 wind turbine with a capacity of 1,5 MW, located in the Łódź voivodeship,
  • Szadek - 1 Enercon E-66 wind turbine with a capacity of 1,5 MW, located in the Łódź voivodeship,
  • Jelno - 2 Vestas V-17 wind turbines, each with a capacity of 55 kW, located in the Łódź voivodeship.